Rejuvenation Projects Blog

Week 24 – Getting Ready (04/06/09 – 04/12/09)

Posted in Adam Rust Project by adamrust on April 13, 2009

Not much changed on the inside this week. A lot of the interior work was just clean up, drywall patches, caulking the trim, and making preparations for the paint. There was a fairly significant change to the exterior though. The support posts on the front porched were wrapped and decorated. They will also be painted soon. I think the detail on the post wraps helps to add even more character to the look.

Front porch post wraps

Front porch post wraps

The update for next week should have a lot more sparkle and flare, since there will actually be paint on the walls, and it will look amazing! For the most up-to-date pictures of the paint progress, check in here.

Leave a Reply